No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.



The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Select the sector you
want to know more about
With 7.8 GW of renewables installed, 5.5 GW in the pipeline and 713 MW awarded in energy storage, Argentina is shifting toward an open market model that expands private contracting, strengthens the term market and introduces privately financed transmission concessions as a new structural pillar.
The country installed 339 MWh of behind-the-meter storage and 1,214 MW of new self-consumption capacity over the past year, signalling sector maturity. However, the current pace risks undermining Spain’s 2030 energy targets.
ANEEL’s Technical Note No. 03/2026 sets key definitions for battery energy storage systems (BESS), confirms dual network tariffs and assigns capacity reserve costs to generators, shielding end-user electricity tariffs.