No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.



The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Select the sector you
want to know more about
ANEEL’s Technical Note No. 03/2026 sets key definitions for battery energy storage systems (BESS), confirms dual network tariffs and assigns capacity reserve costs to generators, shielding end-user electricity tariffs.
The country is set to reach 4.2 GW of installed renewable energy capacity by 2026. However, 5.1 GW remain without financial close and around USD 5 billion in investment is required to prevent a structural deficit by 2027.
With 1.6 GW already in commercial operation and a further 1.4 GW under testing, Colombia’s solar PV expansion accelerates ahead of a new long-term renewable energy auction scheduled for 2026.